Chiller Set

![]() | ![]() | ![]() | ![]() |
2000 Ton Chiller for NCSU Chiller plant set on the second floor utilizing two cranes and a specilized lifting beam fabricated by our shop. The chiller arrived at 9:00 am and Edwards, Inc. was complete by 3:00 pm the same day.
72,0000 lbsL\
Job Duration: 8 hrs
Equipment Utilized;
Specialized Lifting Beams
Specialized Rigging
(2) Cranes