Pharmaceutical Mechanical Construction
Pharmaceutical mechanical construction in NC.
Completion - 9 months- 2007-2008
Scope- HVAC Ductwork, HVAC Piping, Utility Piping, Process Piping, Equipment Rigging, 1000' of Pipe Bridge, Concrete Equipment Foundations, and Structural Hanger Fabrication
Value: $5.2 Million
Victaulic: All Hydronic systems (chilled water, tower water, domestic water) 24" and below were victaulic
Rigging: (3) 800 hp boilers, (4) Double Stacked Cooling Towers, (3) 1500 ton centrifugal chillers, (4) custom AHUs, (3) Air Compressors, (3) Boiler Stacks, Piping on Pipe Bridge